Projects

Maintenance of the TIER III NCOC NV data center in Atyrau.

Construction of a temporary rotational residential camp "NORTH" in the Tengiz rotational camp.

Design, supply, construction, commissioning and certification according to the TIER III

Installation of installation facilities for the gas treatment complex of the Chinarevo field Zhaik-Munai LLP

Modernization of telephony equipment at the facilities of the CPC oil pipeline in the territory of the Republic of Kazakhstan.

Design, supply and installation of uninterruptible power supplies for communication systems at 17 CPC oil pipeline

Electrical installation work on the territory of the Atyrau Oil Refinery (ANPZ).

Electrical installation work at the Tengiz PS as part of the CPC oil pipeline expansion project.

Supply, installation and commissioning of the access control system ISI Gips Inder

Designing centers for processing tax returns of the Tax Committee of the Ministry of Justice of the Republic of Kazakhstan

Construction of a fiber optic communication line (FOCL) of the oil pipeline of the Caspian Pipeline Consortium (CPC) in the section 116-204 km

Electrical laboratory (ETL) services at the CPC oil pipeline expansion project, section 116-204 km

Installation of metal structures on the territory of the Atyrau Oil Refinery (ANPZ)

Design and installation of a commercial oil metering unit at the Kulzhan field

Installation of the power supply network and structured cabling systems in the office premises of Rosetti Kazakhstan LLP.

Electrical installation work at the complex oil, gas and sulfur treatment unit of the Adgip KKO Karabatan plant.

Installation and commissioning of instrumentation and A equipment as part of the project for expanding the CPC oil pipeline 0-116 km.

Installation of SCS in the office premises of Ersai Caspian Contractor